O link foi enviado para o seu email.

Não foi possível enviar o link para o seu email. Por favor, verifique o seu email.

Missing captcha code. Please check whether your browser is not blocking reCAPTCHA.

Invalid captcha code. Please try again.

Ajuda Online

GEO5

Tree
Settings
Produto:
Programa:
Idioma:

Construction Stages

This toolbar manages the construction stages. The following picture shows the location of individual buttons:

Toolbar "Stages"

Adds construction stage

  • adds a new construction stage at the end of the list

Removes the construction stage

  • removes the last construction stage from the list

Construction stage 1,2 ...

  • switches between individual stages of construction - the selection is performed by using the left mouse button

This bar allows us to define the stages of the construction. Construction stages serve to model gradual building of the construction (essential for programs "Sheeting check", "Settlement", "FEM"). This function can also be used for parametric studies, and in each construction stage, different soil assignments or different design coefficients can be assumed. It is rather advantageous to model earthquake effects on a structure in a separate stage of construction as it is then possible to assume different factors of safety or different design coefficients.

Some types of input (soil assignment, anchors, supports…) there always exists a relationship between construction stages (Heredity).

Some programs show construction stage analysis status using a color stripe.

"Stages" toolbar with analysis status color stripes

The colors have the following meaning:

  • green - there is an analysis in the construction stage which IS SATISFACTORY
  • red - there is an analysis in the construction stage which IS NOT SATISFACTORY
  • grey - there is an analysis in the construction stage which has not been performed yet

Teste o software GEO5.
Gratuitamente e sem restrições nas análises.